Skip to content
VaughanIQYork
Development application Z.18.008 · Ward 4

275 Drumlin Circle

zoning by-law amendment

Stage: ClosedOn the record: “Closed”Filed March 2, 2018
“The proposal contemplates a place of worship in the existing industrial building on the subject property and to develop a parking lot in the rear of the property to serve the place of worship operation. SEE RELATED DA.18.014 FOR DRAWINGS, REPORTS AND CORRESPONDENCE. Recevied MMAH approval for parking within the parkway belt”
The City of Vaughan’s description, in its own words · checked November 28, 2026

Where it stands

Stage from the City of Vaughan’s status, November 28, 2026

The municipality has closed this application file. The record lists what was recorded.

Diagram of the zoning around 275 Drumlin CircleThe municipality's zoning polygons within about 140 metres of the file's recorded point; the point falls in a zone coded PB1. A diagram, not to scale and not a survey: no building or design is drawn.EM2EM2Diagram, not to scaleCity of Vaughan zoning and planning open data
Zoning areas around the site; the recorded point falls in PB1 today, which is the zone, not the proposal. Streets show as the gaps between zones. No building or design is drawn. File Z.18.008.
1
application in this project: zoning by-law amendment
City of Vaughan record
1
dated step on the record; the latest March 2, 2018
Checked November 28, 2026
1
other significant file within 1 km
City of Vaughan record
How we know
Last checked November 28, 2026City of VaughanHow we know
Publisher
City of Vaughan
Source dataset
Development applications (City of Vaughan ArcGIS layers)
Retrieved
November 28, 2026
Licence
City of Vaughan data — used with the City's permission (owner record, 2026-11-28) Terms
From the source
the project and application names · file numbers · status · dates where recorded · the description of the proposal
Derived by VaughanIQ
the stage label · grouping of linked applications into one project · area and ward by the site's location · what is nearby · the zoning diagram, from the zoning layer's polygons around the recorded point
VaughanIQ’s words
the summary sentence
Kept current
Rebuilt from the municipality's source by the data pipeline; each run is dated, and changes between runs are listed on the changes page.

Proposed, in the record's words: “The proposal contemplates a place of worship in the existing industrial building on the subject property and to develop a parking lot in the rear of the property to serve the place of worship operation. SEE RELATED…”. Latest dated step on the record: application received, March 2, 2018. File Z.18.008. As of November 28, 2026 · City of Vaughan

Data currency. Read from the City of Vaughan source on November 28, 2026. The source was last edited November 28, 2026. Only 2,122 of 2,123 records carry a date; the newest is November 26, 2026. Development applications (City of Vaughan ArcGIS layers)

What is being asked

One application

275 Drumlin Circle is a zoning by-law amendment on the City of Vaughan's record in Ward 4. It has been closed.

What is proposed

The proposal contemplates a place of worship in the existing industrial building on the subject property and to develop a parking lot in the rear of the property to serve the place of worship operation. SEE RELATED DA.18.014 FOR DRAWINGS, REPORTS AND CORRESPONDENCE. Recevied MMAH approval for parking within the parkway belt

The City of Vaughan’s description of the application, as published.

The application

As the municipality records it.

  1. Zoning by-law amendment

    Z.18.008

    Type
    Zoning by-law amendment (Zoning By-law Amendment)
    Status on the record
    Closed
    Received
    March 2, 2018

What has happened

Every dated item on the record
  1. Application received

    Zoning by-law amendment · Z.18.008 · 2018

Every date in the municipality’s record for this project’s applications, in order. Nothing is inferred between them.

Other projects within 1 km

Development in Ward 4
275 Drumlin Circle and other planning files within 1 km275 Drumlin Circle (ringed) and 1 other significant file on the City of Vaughan's record within 1 km, over the zoning layer.84 Drumlin Circle, Lot 30, Registered Plan No. 65M-2157 · Under review · 380 m1 km around the siteCity of Vaughan open data
  • This project
  • Under review (1)
  • 1 km

Statuses as the City of Vaughan publishes them; distances straight-line from the file’s recorded point · November 28, 2026

Around the site

275 Drumlin Circle
Aerial view of 275 Drumlin Circle, Vaughan
Contains information licensed under the Open Government Licence – Ontario

Parks nearby

Schools, heritage and transit

Nearest schools

Distances are between recorded positions, as the crow flies, not walking routes.

What the stages mean

The same words on every VaughanIQ project
Stage: Pre-application
Proposed to the municipality, but a complete application has not yet been received.
Stage: Under review
Filed with the municipality and being reviewed.
Stage: Under appeal
A decision, or the lack of one, has been appealed to the Ontario Land Tribunal.
Stage: On hold
The municipality lists the application as on hold, for example while it waits for more material.
Stage: Approved
The application has been approved. Building may not have started.
Stage: Complete
Final approval has been given or the plan has been registered.
Stage: Closed
The municipality has closed this application file. The record lists what was recorded.275 Drumlin Circle is here.
Stage: Refused
The application was refused.

Sources

  1. 01Development applications (City of Vaughan ArcGIS layers) — checked November 28, 2026

Contains information provided by the City of Vaughan City of Vaughan data — used with the City's permission (owner record, 2026-11-28). Figures are the municipality’s records at the date checked; a later submission can change them.

How we draw the diagram

The shapes are the City’s zoning-layer polygons within about 140 m of the file’s recorded point, simplified for drawing, with their zone codes as published. The tinted shape is the zone the point falls in today. Streets are the gaps between zones. Nothing in the diagram is the proposal: no building, height or design is drawn.

More