Stage: ClosedOn the record: “Closed”Filed March 8, 2018
“The Owner has submitted the following applications: a) Official Plan Amendment File OP.18.005 to permit an increase in maximum building height from 30-storeys to 39-storeys and a maximum density of 5 times the area of the land (FSI) to 5.72 FSI. b) Zoning By-law Amendment File Z.18.009 to rezone the subject lands from EM1 Prestige Employment Area Zone to C9 Corporate Centre Zone and to permit site-specific…”
The City of Vaughan’s description, in its own words · checked November 28, 2026
Where it stands
Stage from the City of Vaughan’s status, November 28, 2026
The municipality has closed this application file. The record lists what was recorded.
Diagram, not to scaleCity of Vaughan zoning and planning open data
Zoning areas around the site; the recorded point falls in V1 today, which is the zone, not the proposal. Streets show as the gaps between zones. No building or design is drawn. File 19T-18V005.
1
application in this project: plan of subdivision
City of Vaughan record
2
dated steps on the record; the latest April 24, 2018
Checked November 28, 2026
80
other significant files within 1 km
City of Vaughan record
How we know
Last checked November 28, 2026·City of VaughanHow we know+
City of Vaughan data — used with the City's permission (owner record, 2026-11-28) Terms
From the source
the project and application names · file numbers · status · dates where recorded · the description of the proposal
Derived by VaughanIQ
the stage label · grouping of linked applications into one project · area and ward by the site's location · what is nearby · the zoning diagram, from the zoning layer's polygons around the recorded point
VaughanIQ’s words
the summary sentence
Kept current
Rebuilt from the municipality's source by the data pipeline; each run is dated, and changes between runs are listed on the changes page.
Proposed, in the record's words: “The Owner has submitted the following applications: a) Official Plan Amendment File OP.18.005 to permit an increase in maximum building height from 30-storeys to 39-storeys and a maximum density of 5 times the area of…”. Latest dated step on the record: deemed complete, April 24, 2018. File 19T-18V005. As of November 28, 2026 · City of Vaughan
Data currency. Read from the City of Vaughan source on November 28, 2026. The source was last edited November 28, 2026. Only 2,122 of 2,123 records carry a date; the newest is November 26, 2026. Development applications (City of Vaughan ArcGIS layers)
What is being asked
One application
Lot 3, Plan 7977. 2871 Highway No. 7 (file 19T-18V005) is a plan of subdivision on the City of Vaughan's record in Ward 4. It has been closed.
What is proposed
The Owner has submitted the following applications: a) Official Plan Amendment File OP.18.005 to permit an increase in maximum building height from 30-storeys to 39-storeys and a maximum density of 5 times the area of the land (FSI) to 5.72 FSI. b) Zoning By-law Amendment File Z.18.009 to rezone the subject lands from EM1 Prestige Employment Area Zone to C9 Corporate Centre Zone and to permit site-specific development standards and to permit the bonusing for increased building height and density for the proposed development than permitted by Vaughan Official Plan (VOP) 2010 in return for the
The City of Vaughan’s description of the application, as published.
The application
As the municipality records it.
Plan of subdivision
19T-18V005
Type
Plan of subdivision (Subdivision)
Status on the record
Closed
Received
March 8, 2018
Deemed complete
April 24, 2018
Filings since 2018
Every dated item on the record
Apr24
Deemed complete
Plan of subdivision · 19T-18V005 · 2018
Mar8
Application received
Plan of subdivision · 19T-18V005 · 2018
Every date in the municipality’s record for this project’s applications, in order. Nothing is inferred between them.
The shapes are the City’s zoning-layer polygons within about 140 m of the file’s recorded point, simplified for drawing, with their zone codes as published. The tinted shape is the zone the point falls in today. Streets are the gaps between zones. Nothing in the diagram is the proposal: no building, height or design is drawn.