Rutherford Rd/Jane St.
zoning by-law amendment
“The proposal includes the installation of a 30m2 temporary structure in the parking lot of Vaughan Mills Shopping Centre (Figure 1 and 2). The prposed building is an existing structure, constructed from a shipping container.”
Where it stands
Stage from the City of Vaughan’s status, November 28, 2026The municipality has closed this application file. The record lists what was recorded.
How we know
Last checked November 28, 2026City of VaughanHow we know
- Publisher
- City of Vaughan
- Source dataset
- Development applications (City of Vaughan ArcGIS layers)
- Retrieved
- November 28, 2026
- Licence
- City of Vaughan data — used with the City's permission (owner record, 2026-11-28) Terms
- From the source
- the project and application names · file numbers · status · dates where recorded · the description of the proposal
- Derived by VaughanIQ
- the stage label · grouping of linked applications into one project · area and ward by the site's location · what is nearby · the zoning diagram, from the zoning layer's polygons around the recorded point
- VaughanIQ’s words
- the summary sentence
- Kept current
- Rebuilt from the municipality's source by the data pipeline; each run is dated, and changes between runs are listed on the changes page.
Proposed, in the record's words: “The proposal includes the installation of a 30m2 temporary structure in the parking lot of Vaughan Mills Shopping Centre (Figure 1 and 2). The prposed building is an existing structure, constructed from a shipping…”. Latest dated step on the record: deemed complete, November 8, 2017. File Z.17.036. As of November 28, 2026 · City of Vaughan
Data currency. Read from the City of Vaughan source on November 28, 2026. The source was last edited November 28, 2026. Only 2,122 of 2,123 records carry a date; the newest is November 26, 2026. Development applications (City of Vaughan ArcGIS layers)
What is being asked
Rutherford Rd/Jane St. is a zoning by-law amendment on the City of Vaughan's record in Ward 4. It has been closed.
What is proposed
The proposal includes the installation of a 30m2 temporary structure in the parking lot of Vaughan Mills Shopping Centre (Figure 1 and 2). The prposed building is an existing structure, constructed from a shipping container.
The City of Vaughan’s description of the application, as published.
The application
As the municipality records it.
Zoning by-law amendment
Z.17.036
- Type
- Zoning by-law amendment (Zoning By-law Amendment)
- Status on the record
- Closed
- Received
- October 13, 2017
- Deemed complete
- November 8, 2017
Filings since 2017
Deemed complete
Zoning by-law amendment · Z.17.036 · 2017
Application received
Zoning by-law amendment · Z.17.036 · 2017
Every date in the municipality’s record for this project’s applications, in order. Nothing is inferred between them.
Other projects within 1 km
Development in Ward 4- This project
- Under review (12)
- Closed (10)
- 1 km
- Part Lot 15, Con. 4 (9075 and 9085 Jane Street).Stage: ClosedZoning by-law amendment · Ward 4 · 250 m
- Part of Lot 15, Concession 4 (file Z.21.041)Stage: Under reviewZoning by-law amendment · Ward 4 · 280 m
- Part of Lot 15, Concession 4 (file OP.21.020)Stage: Under reviewOfficial plan amendment · Ward 4 · 280 m
- 9095 Jane Street L4K 0L8Stage: ClosedZoning by-law amendment · Ward 4 · 280 m
- Part of Block 1, Plan 65M-3696 and Pt. 3 and 7, Plan 65R-38270.Stage: Under reviewZoning by-law amendment · Ward 4 · 300 m
Statuses as the City of Vaughan publishes them; distances straight-line from the file’s recorded point · November 28, 2026
Around the site
Parks nearby
- Julliard ParkNeighbourhood 2 · playground, shade shelter · 590 m
- Komura Road ParkNeighbourhood 2 · basketball court, playground · 880 m
Schools, heritage and transit
Nearest schools
- Julliard Public School · elementary school · 530 m
- Maple High School · secondary school · 1.3 km
- St Emily Catholic Elementary School · elementary school · 1.5 km
Distances are between recorded positions, as the crow flies, not walking routes.
What the stages mean
- Stage: Pre-application
- Proposed to the municipality, but a complete application has not yet been received.
- Stage: Under review
- Filed with the municipality and being reviewed.
- Stage: Under appeal
- A decision, or the lack of one, has been appealed to the Ontario Land Tribunal.
- Stage: On hold
- The municipality lists the application as on hold, for example while it waits for more material.
- Stage: Approved
- The application has been approved. Building may not have started.
- Stage: Complete
- Final approval has been given or the plan has been registered.
- Stage: Closed
- The municipality has closed this application file. The record lists what was recorded.Rutherford Rd/Jane St. is here.
- Stage: Refused
- The application was refused.
Sources
- 01Development applications (City of Vaughan ArcGIS layers) — checked November 28, 2026
Contains information provided by the City of Vaughan City of Vaughan data — used with the City's permission (owner record, 2026-11-28). Figures are the municipality’s records at the date checked; a later submission can change them.
How we draw the diagram
The shapes are the City’s zoning-layer polygons within about 140 m of the file’s recorded point, simplified for drawing, with their zone codes as published. The tinted shape is the zone the point falls in today. Streets are the gaps between zones. Nothing in the diagram is the proposal: no building, height or design is drawn.