Building permits in Ward 5

What the City of Vaughan issued in this ward of Vaughan: how many, for what, and where.

337
permits in the last 12 months
December 2025 to November 2026
$101.7 million
construction value
As the permits state it
8
new-home permits
Last 12 months
17%
of Vaughan’s permits
Last 12 months

Ward 5 had 337 building permits issued in the twelve months to November 2026, 17% of Vaughan’s 2,003. Most were for new homes (8). Since January 4, 2021 the record holds 1,618 permits here.

As of November 29, 2026 · Building Permits (City of Vaughan layer v_Permit_)

Major building permits in Ward 5, since 2021New homes, new non-residential buildings, second units and demolitions in Ward 5, at the positions the permit record gives.New home · 30 Upper Mall · December 22, 2022 · $119.6 millionNew home · 7950 Bathurst · June 2, 2021 · $91.2 millionNew home · 8188 Yonge · December 8, 2022 · $59.5 millionNew home · 7950 Bathurst · June 2, 2021 · $35.1 millionNew home · 8 Beverley Glen · April 8, 2022 · $29.4 millionNew home · 8 Beverley Glen · April 8, 2022 · $20.3 millionNew non-residential · 434 Steeles · June 26, 2023 · $18.3 millionNew home · 59 Riverside · April 6, 2022 · $10.8 millionNew home · 170 Arnold · July 30, 2026 · $8.7 millionNew home · 12 Shasta · March 16, 2023 · $8.6 millionNew home · 72 Arnold · May 8, 2026 · $7.6 millionNew home · 187 Arnold · June 18, 2026 · $6.4 millionNew home · 24 Thornhill · November 16, 2026 · $5.7 millionNew home · 58 Crestwood · February 17, 2026 · $5.3 millionNew home · 8 Peter Morse · May 7, 2026 · $5.3 millionNew home · 81 Hilda · December 18, 2025 · $4.5 millionNew non-residential · 770 Chabad · November 8, 2021 · $3.4 millionNew home · 125 Parr · December 12, 2023 · $2.9 millionNew home · 51 Thornbank · May 3, 2022 · $2.7 millionNew home · 149 Arnold · April 4, 2024 · $2.7 millionNew non-residential · 80 York Hill · June 2, 2023 · $2.4 millionNew home · 11 Fairlea · December 23, 2024 · $2.4 millionNew home · 18 Arnold · October 23, 2023 · $2.3 millionNew home · 7 Thornbank · March 1, 2022 · $2.1 millionNew home · 6 Riverside · September 26, 2024 · $2.1 millionNew home · 41 Thornbank · October 4, 2021 · $2 millionNew home · 272 Tansley · October 9, 2024 · $1.9 millionNew home · 10 Peter Morse · September 20, 2024 · $1.9 millionNew home · 9 Peter Morse · September 19, 2024 · $1.9 millionNew home · 69 Thornbank · July 19, 2023 · $1.8 millionNew home · 110 Vaughan · September 11, 2023 · $1.8 millionNew home · 112 Thornridge · February 24, 2023 · $1.7 millionNew home · 9 Parkway · October 14, 2022 · $1.7 millionNew home · 18 Thornhill · January 24, 2023 · $1.7 millionNew home · 20 Helen · January 21, 2026 · $1.7 millionNew home · 3 Erica · October 24, 2023 · $1.7 millionNew home · 53 Thornridge · April 2, 2024 · $1.6 millionNew non-residential · 1054 Centre · January 10, 2022 · $1.6 millionNew home · 140 Parr · August 23, 2023 · $1.5 millionNew home · 12 Parkway · April 12, 2023 · $1.4 millionNew home · 6 Campbell · November 27, 2024 · $1.4 millionNew home · 188 Crestwood · June 5, 2023 · $1.2 millionNew home · 117 Crestwood · April 25, 2023 · $1.2 millionNew home · 180 Parr · July 16, 2021 · $1.2 millionNew home · 49 Longbridge · November 26, 2025 · $1.1 millionNew home · 193 Crestwood · September 15, 2023 · $1.1 millionNew home · 21 Idleswift · March 14, 2022 · $1.1 millionNew home · 53 Longbridge · February 17, 2023 · $1.1 millionNew home · 102 Crestwood · April 14, 2022 · $1 millionNew home · 100 Crestwood · April 12, 2022 · $1 millionNew home · 98 Crestwood · April 20, 2022 · $1 millionDemolition · 53 Longbridge · September 7, 2022 · $1 millionDemolition · 21 Idleswift · March 10, 2022 · $1 millionNew home · 85 Crestwood · December 5, 2022 · $998,596New home · 117A Crestwood · April 25, 2023 · $830,947Demolition · 12 Parkway · February 16, 2023 · $800,000New home · 75 Pinewood · August 13, 2021 · $775,400New home · 3 Parkway · June 2, 2021 · $750,000New home · 8 Campbell · September 13, 2024 · $692,670New home · 18 Oakbank · December 14, 2021 · $677,700New home · 226 Townsgate · June 1, 2022 · $636,000New home · 230 Townsgate · June 1, 2022 · $636,000Second unit · 15 Mill · December 23, 2025 · $500,000New home · 23 Alton · August 14, 2023 · $487,596New home · 9 Alton · July 5, 2023 · $480,577New home · 5 Alton · July 5, 2023 · $479,393New home · 192 Atkinson · July 2, 2023 · $475,952New home · 248 Atkinson · June 29, 2023 · $475,952New home · 200 Atkinson · July 2, 2023 · $471,270New home · 244 Atkinson · June 29, 2023 · $471,270New home · 222 Atkinson · June 29, 2023 · $471,270New home · 210 Atkinson · June 29, 2023 · $465,997New home · 232 Atkinson · June 29, 2023 · $464,006New home · 226 Atkinson · June 29, 2023 · $464,006New home · 236 Atkinson · June 29, 2023 · $459,324New home · 214 Atkinson · June 29, 2023 · $459,324New home · 204 Atkinson · July 2, 2023 · $458,033New home · 240 Atkinson · June 29, 2023 · $457,333New home · 196 Atkinson · July 2, 2023 · $455,342New home · 218 Atkinson · June 29, 2023 · $455,342New home · 111 Alton · August 3, 2023 · $435,233New home · 4 Chesley · August 3, 2023 · $433,441New home · 22 Chesley · August 3, 2023 · $423,088New home · 35 Alton · August 14, 2023 · $410,893New home · 53 Alton · June 16, 2023 · $410,893New home · 26 Burleigh · August 3, 2023 · $407,160New home · 48 Burleigh · August 3, 2023 · $405,766New home · 59 Alton · June 19, 2023 · $404,920New home · 41 Alton · June 16, 2023 · $400,992New home · 75 Alton · June 19, 2023 · $399,001New home · 17 Alton · July 5, 2023 · $398,517New home · 27 Alton · August 14, 2023 · $398,149New home · 63 Alton · June 19, 2023 · $396,149New home · 67 Alton · June 19, 2023 · $396,149New home · 71 Alton · June 19, 2023 · $396,149New home · 45 Alton · June 16, 2023 · $396,149New home · 13 Alton · July 5, 2023 · $395,665New home · 4 Burleigh · August 3, 2023 · $391,630New home · 31 Alton · August 14, 2023 · $390,176New home · 49 Alton · June 16, 2023 · $390,176New home · 85 Alton · July 6, 2023 · $381,083New home · 161 Alton · July 5, 2023 · $381,083New home · 11 Burleigh · August 3, 2023 · $375,757New home · 105 Alton · July 6, 2023 · $371,128New home · 141 Alton · July 5, 2023 · $371,128New home · 135 Alton · August 3, 2023 · $370,967New home · 16 Chesley · August 3, 2023 · $365,802New home · 23 Burleigh · August 3, 2023 · $365,802New home · 34 Chesley · August 8, 2023 · $365,694New home · 29 Burleigh · August 3, 2023 · $365,694New home · 41 Burleigh · August 3, 2023 · $365,694New home · 89 Alton · July 6, 2023 · $360,312New home · 93 Alton · July 6, 2023 · $360,312New home · 97 Alton · July 6, 2023 · $360,312New home · 101 Alton · July 6, 2023 · $360,312New home · 145 Alton · July 5, 2023 · $360,312New home · 149 Alton · July 5, 2023 · $360,312New home · 153 Alton · July 5, 2023 · $360,312New home · 157 Alton · July 5, 2023 · $360,312New home · 115 Alton · August 3, 2023 · $360,151New home · 119 Alton · August 3, 2023 · $360,151New home · 123 Alton · August 3, 2023 · $360,151New home · 127 Alton · August 3, 2023 · $360,151New home · 131 Alton · August 3, 2023 · $360,151New home · 114 Alton · August 3, 2023 · $350,573New home · 138 Alton · August 8, 2023 · $349,389New home · 20 Burleigh · August 3, 2023 · $349,389New home · 106 Alton · August 3, 2023 · $349,389New home · 49 Burleigh · August 3, 2023 · $349,282New home · 8 Chesley · August 3, 2023 · $349,228New home · 12 Chesley · August 3, 2023 · $349,228New home · 15 Burleigh · August 3, 2023 · $349,228New home · 19 Burleigh · August 3, 2023 · $349,228New home · 42 Burleigh · August 3, 2023 · $349,228New home · 130 Alton · August 3, 2023 · $349,228New home · 26 Chesley · August 3, 2023 · $349,120New home · 30 Chesley · August 3, 2023 · $349,120New home · 33 Burleigh · August 3, 2023 · $349,120New home · 37 Burleigh · August 3, 2023 · $349,120New home · 30 Burleigh · August 3, 2023 · $342,609New home · 34 Burleigh · August 3, 2023 · $342,609New home · 38 Burleigh · August 3, 2023 · $342,609New home · 118 Alton · August 3, 2023 · $342,609New home · 122 Alton · August 3, 2023 · $342,609New home · 126 Alton · August 3, 2023 · $342,609New home · 142 Alton · August 8, 2023 · $340,726New home · 146 Alton · August 8, 2023 · $340,726New home · 150 Alton · August 8, 2023 · $340,726New home · 8 Burleigh · August 3, 2023 · $340,726New home · 12 Burleigh · August 3, 2023 · $340,726New home · 16 Burleigh · August 3, 2023 · $340,726New home · 94 Alton · August 3, 2023 · $340,726New home · 98 Alton · August 3, 2023 · $340,726New home · 102 Alton · August 3, 2023 · $340,726New home · 52 Burleigh · August 3, 2023 · $340,726New home · 56 Burleigh · August 3, 2023 · $340,726New home · 60 Burleigh · August 3, 2023 · $340,726New home · 64 Burleigh · August 3, 2023 · $340,726New home · 53 Burleigh · August 3, 2023 · $340,672New home · 57 Burleigh · August 3, 2023 · $340,672New home · 61 Burleigh · August 3, 2023 · $340,672New home · 90 Alton · August 3, 2023 · $339,758New home · 154 Alton · August 3, 2023 · $339,758New home · 65 Burleigh · August 3, 2023 · $339,704New home · 42 Chesley · August 3, 2023 · $336,479New home · 46 Chesley · August 3, 2023 · $326,524New home · 50 Chesley · August 3, 2023 · $324,533New home · 54 Chesley · August 3, 2023 · $324,533New home · 58 Chesley · August 3, 2023 · $324,533New home · 7420 Bathurst · February 26, 2024 · $211,700Demolition · 11 Fairlea · September 4, 2024 · $202,996Demolition · 434 Steeles · January 4, 2023 · $150,000Second unit · 30 Patrice · April 21, 2026 · $139,766Second unit · 111 Roseborough · November 27, 2024 · $137,836Second unit · 80 Brownridge · August 29, 2025 · $126,705Second unit · 33 Centre · March 13, 2023 · $124,205Second unit · 129 Beverley Glen · November 18, 2024 · $103,626Demolition · 3 Erica · August 29, 2023 · $100,000Second unit · 12 Oakmount · February 6, 2025 · $95,850Second unit · 31 Swinton · June 9, 2022 · $88,720Second unit · 489 Beverley Glen · November 17, 2022 · $85,000Second unit · 10 Jason · June 14, 2023 · $83,980Second unit · 30 Miriam Garden · March 21, 2023 · $80,750Second unit · 53 Anthony · March 9, 2026 · $79,000Second unit · 247 Hammerstone · March 4, 2024 · $77,600Second unit · 244 Glen Shields · August 29, 2024 · $77,431Second unit · 215 Anthony · November 18, 2024 · $77,080Second unit · 429 Worth · October 19, 2023 · $76,628Second unit · 25 Bevshire · April 30, 2024 · $75,177Second unit · 11 Glenbury · April 24, 2026 · $75,122Second unit · 50 Tansley · September 9, 2024 · $73,317Second unit · 12 Longbridge · July 27, 2026 · $72,448Second unit · 27 Coulter's Mill · May 29, 2026 · $72,338Second unit · 197 Anthony · July 23, 2025 · $70,418New home · 291 York Hill · September 12, 2024 · $70,070Second unit · 419 Conley · December 7, 2022 · $69,500Second unit · 229 Spring Gate · May 8, 2026 · $68,955Second unit · 22 Rockwood · September 15, 2023 · $68,428Second unit · 44 Green Acres · April 6, 2023 · $67,716Second unit · 121 Mcmorran · October 18, 2024 · $67,450Second unit · 286 Conley · January 2, 2024 · $66,560Second unit · 67 Conley · December 17, 2024 · $66,108Second unit · 96 Winding · August 7, 2026 · $64,468Second unit · 91 Crestwood · March 8, 2023 · $62,662Second unit · 39 Millcroft · August 20, 2024 · $60,350Second unit · 46 Hinda · January 5, 2024 · $60,000Second unit · 29 Crooked Stick · December 18, 2025 · $59,335Second unit · 97 Prairie Dunes · July 24, 2023 · $58,250Second unit · 126 Colvin · November 6, 2024 · $57,891Second unit · 93 Heatherton · June 27, 2025 · $56,253Second unit · 43 Donisi · March 7, 2023 · $55,290Second unit · 337 Glen Shields · May 7, 2024 · $54,720Second unit · 113 Anthony · April 16, 2024 · $54,720Second unit · 234 Mullen · November 26, 2026 · $54,670Second unit · 568 Brownridge · September 2, 2025 · $53,514Second unit · 86 Pauline · August 3, 2023 · $50,958Second unit · 207 Lisa · October 17, 2024 · $50,487Demolition · 187 Arnold · May 11, 2026 · $50,000Demolition · 110 Vaughan · August 14, 2023 · $50,000New non-residential · 927 Clark · November 30, 2022 · $50,000Demolition · 80 York Hill · August 24, 2022 · $50,000Demolition · 18 Thornhill · November 8, 2021 · $50,000Second unit · 123 Rosedale Heights · July 28, 2026 · $49,789Second unit · 174 Anthony · August 11, 2022 · $48,909Second unit · 100 North Meadow · January 25, 2023 · $47,971Second unit · 156 Pinewood · December 1, 2023 · $46,385Second unit · 72 Bradbeer · July 14, 2023 · $45,752Second unit · 30 Colleen · September 14, 2021 · $45,000Second unit · 76 Royal Palm · April 14, 2025 · $44,290Second unit · 70 Oakmount · July 8, 2025 · $43,580Second unit · 64 Millbank · October 3, 2023 · $41,697New non-residential · 265 Beverley Glen · July 25, 2025 · $40,000Second unit · 18 Venice · July 14, 2022 · $40,000Demolition · 100 Crestwood · February 2, 2022 · $40,000Demolition · 102 Crestwood · February 2, 2022 · $40,000Second unit · 29 Thomas Henry · March 21, 2022 · $37,730New home · 138 Lisa · June 13, 2022 · $32,434Demolition · 53 Thornridge · March 1, 2024 · $30,000Second unit · 296 Conley · August 16, 2022 · $30,000Demolition · 41 Thornbank · June 28, 2021 · $30,000Second unit · 97 Prairie Dunes · February 7, 2023 · $29,125Second unit · 79 Mullen · August 30, 2021 · $25,500New non-residential · 1 Promenade · June 11, 2024 · $25,000Demolition · 69 Thornbank · November 14, 2022 · $25,000Demolition · 72 Arnold · March 19, 2026 · $20,000Demolition · 6 Riverside · September 26, 2024 · $20,000Demolition · 209 Crestwood · May 16, 2024 · $20,000Demolition · 18 Arnold · October 12, 2023 · $20,000Demolition · 12 Shasta · October 20, 2022 · $20,000Demolition · 7 Thornbank · December 2, 2021 · $20,000Demolition · 7994 Yonge · July 27, 2026 · $19,999Second unit · 8 Brownridge · December 24, 2025 · $15,000Demolition · 49 Longbridge · September 12, 2025 · $15,000Demolition · 112 Thornridge · December 20, 2022 · $15,000Demolition · 8 Campbell · November 27, 2022 · $15,000Demolition · 188 Crestwood · November 8, 2021 · $15,000Demolition · 196 Crestwood · November 8, 2021 · $15,000Demolition · 198 Crestwood · November 8, 2021 · $15,000Demolition · 9 Parkway · February 27, 2026 · $10,000New non-residential · 475 Brownridge · July 8, 2024 · $10,000Demolition · 300 Atkinson · March 11, 2022 · $10,000Demolition · 51 Thornbank · December 13, 2021 · $10,000Second unit · 94 Heatherton · August 4, 2026 · $5,832Demolition · 24 Thornhill · September 29, 2026 · $5,000New non-residential · 1441 Clark · July 10, 2026 · $5,000Demolition · 170 Arnold · May 26, 2026 · $5,000Demolition · 37 Riverside · November 24, 2025 · $5,000Demolition · 58 Crestwood · November 18, 2025 · $5,000Demolition · 20 Helen · October 15, 2025 · $5,000New non-residential · 1441 Clark · June 24, 2025 · $5,000New non-residential · 1441 Clark · July 5, 2024 · $5,000New non-residential · 1441 Clark · June 18, 2024 · $5,000Demolition · 149 Arnold · December 11, 2023 · $5,000New non-residential · 1441 Clark · July 7, 2023 · $5,000Demolition · 117 Crestwood · August 22, 2022 · $5,000Demolition · 9 Parkway · June 29, 2022 · $5,000New non-residential · 1441 Clark · June 17, 2022 · $5,000Demolition · 26 Old Yonge · April 21, 2022 · $5,000Demolition · 59 Riverside · January 10, 2022 · $5,000Demolition · 230 Flamingo · November 3, 2021 · $5,000New non-residential · 1441 Clark · May 27, 2026 · $4,999New non-residential · 1441 Clark · July 7, 2023 · $4,900New non-residential · 1441 Clark · June 30, 2022 · $4,900New non-residential · 770 Chabad · September 21, 2026 · $3,500New non-residential · 1441 Clark · August 10, 2022 · $1,500Demolition · 193 Crestwood · September 13, 2023 · $500Second unit · 129 Beverley Glen · January 7, 2026Second unit · 111 Roseborough · October 15, 2025Second unit · 43 Donisi · July 31, 2025Second unit · 128 Langtry · February 28, 2024Second unit · 46 Hinda · February 2, 2024Demolition · 46 Centre · October 13, 2023New home · 20 Gatineau · July 25, 2022New home · 8188 Yonge · June 30, 2022New home · 30 Upper Mall · May 16, 2022New home · 30 Upper Mall · June 2, 2021New home · 7950 Bathurst · April 28, 2021Major workCity of Vaughan permit record
  • New home
  • Second unit
  • New non-residential
  • Demolition

Streets traced through the municipality's address points.

Month by month

December 2024 to November 2026
Permits issued each month in Ward 5

Counted by issue date.

Permits issued each month in Ward 5
MonthPermits issuedConstruction value
December 202411$2.8 million
January 202516$1.2 million
February 202512$2.7 million
March 202513$8.2 million
April 202523$10.8 million
May 202520$3.8 million
June 202520$5.5 million
July 202522$1.1 million
August 202521$1.9 million
September 202520$2.8 million
October 202526$2.1 million
November 202515$2.6 million
December 202521$6.7 million
January 202613$2 million
February 202619$6.6 million
March 202627$1.3 million
April 202619$837,179
May 202623$36.6 million
June 202651$9.9 million
July 202671$23.5 million
August 202637$2.2 million
September 202619$770,428
October 202617$3.5 million
November 202620$7.8 million
Construction value each month in Ward 5

The value each permit states, summed.

Construction value each month in Ward 5
MonthPermits issuedConstruction value
December 202411$2.8 million
January 202516$1.2 million
February 202512$2.7 million
March 202513$8.2 million
April 202523$10.8 million
May 202520$3.8 million
June 202520$5.5 million
July 202522$1.1 million
August 202521$1.9 million
September 202520$2.8 million
October 202526$2.1 million
November 202515$2.6 million
December 202521$6.7 million
January 202613$2 million
February 202619$6.6 million
March 202627$1.3 million
April 202619$837,179
May 202623$36.6 million
June 202651$9.9 million
July 202671$23.5 million
August 202637$2.2 million
September 202619$770,428
October 202617$3.5 million
November 202620$7.8 million

What the permits were for

Last 12 months
Building permits in Ward 5 by kind of work, December 2025 to November 2026
Kind of workPermitsConstruction valueHomes created
New homes8$45.1 million10
Second units and additional dwelling units14$1.3 million14
Additions2$30,728—
Renovations and alterations156$20.5 million—
Garages, sheds and other accessory buildings12$13.1 million—
Demolitions6$109,999—
New non-residential buildings3$13,499—
Signs15$261,000—
Plumbing, drains, mechanical and site services27$130,000—
Other or not stated94$21.1 million—

Year by year

Building permits in Ward 5 by year
YearPermitsNew-home permitsConstruction valueHomes created
2026(part year)3167$95 million18
20252292$49.5 million14
202421811$55.6 million26
2023400121$178.8 million135
202223519$298.9 million1,616
20212209$159.4 million1,661

Streets in Ward 5 with the most permits

Since 2021

The largest permits, last 12 months

  • Other · 18 Atkinson
    BP - Ind./Com./Inst/High-Rise Res. · Elementary School · May 22, 2026 · Permit 25 108570 CND 01-C
    $19.9 million
  • Accessory building · 7300 Yonge
    BP - Ind./Com./Inst/High-Rise Res. · Alteration and improvements · Garage or Carport · July 2, 2026 · Permit 26 106973 000 00-C
    $12.7 million
  • New home · 170 Arnold
    BP - Housing (Single, Semi, Townhouse) · New Construction · Single Detached Dwelling · July 30, 2026 · Permit 24 130525 000 00-A
    $8.7 million
  • New home · 72 Arnold
    BP - Housing (Single, Semi, Townhouse) · New Construction · Single Detached Dwelling · May 8, 2026 · Permit 26 105496 000 00-A
    $7.6 million
  • New home · 187 Arnold
    BP - Housing (Single, Semi, Townhouse) · New Construction · Single Detached Dwelling · June 18, 2026 · Permit 26 109505 000 00-A
    $6.4 million
  • New home · 24 Thornhill
    BP - Housing (Single, Semi, Townhouse) · New Construction · Single Detached Dwelling · November 16, 2026 · Permit 26 135572 000 00-A
    $5.7 million
  • New home · 58 Crestwood
    BP - Housing (Single, Semi, Townhouse) · New Construction · Single Detached Dwelling · February 17, 2026 · Permit 25 138231 000 00-A
    $5.3 million
  • New home · 8 Peter Morse
    BP - Housing (Single, Semi, Townhouse) · New Construction · Single Detached Dwelling · May 7, 2026 · Permit 25 141432 000 00-A
    $5.3 million

Most recently issued building work

  • Second unit · 234 Mullen
    Secondary Suites · New Construction · Single Detached Dwelling · November 26, 2026 · Permit 26 112288 000 00-SS
    $54,670
  • Renovation · 12 Checker
    BP - Housing (Single, Semi, Townhouse) · Alteration and improvements · Single Detached Dwelling · November 25, 2026 · Permit 26 132294 000 00-A
    $42,950
  • Other · 299 Mullen
    BP - Designated Structure · Alteration and improvements · November 23, 2026 · Permit 26 117375 000 00-DS
    $120,000
  • Renovation · 131 Mulholland
    BP - Housing (Single, Semi, Townhouse) · Alteration and improvements · Single Detached Dwelling · November 23, 2026 · Permit 26 139049 000 00-A
    $6,542
  • Other · 67 Windhaven
    BP - Housing (Single, Semi, Townhouse) · Single Detached Dwelling · November 20, 2026 · Permit 26 130379 000 00-A
    $20,000
  • Renovation · 100 Steeles
    BP - Ind./Com./Inst/High-Rise Res. · Alteration and improvements · Restaurant, bar · November 20, 2026 · Permit 26 138529 000 00-C
    $3,000
  • Renovation · 21 Spring Gate
    BP - Housing (Single, Semi, Townhouse) · Alteration and improvements · Single Detached Dwelling · November 19, 2026 · Permit 26 123976 CHP 00-A
    $500,000
  • Renovation · 36 Atkinson
    BP - Ind./Com./Inst/High-Rise Res. · Alteration and improvements · Day care, nursing home · November 17, 2026 · Permit 26 118628 000 00-C
    $100,000
  • New home · 24 Thornhill
    BP - Housing (Single, Semi, Townhouse) · New Construction · Single Detached Dwelling · November 16, 2026 · Permit 26 135572 000 00-A
    $5.7 million
  • Renovation · 531 Atkinson
    BP - Ind./Com./Inst/High-Rise Res. · Alteration and improvements · Office Complex · November 13, 2026 · Permit 26 133653 000 00-C
    $119,195
  • Other · 141 Glenforest
    BP - Housing (Single, Semi, Townhouse) · Single Detached Dwelling · November 12, 2026 · Permit 26 129934 000 00-A
    $1,000
  • Renovation · 66 Mountfield
    BP - Housing (Single, Semi, Townhouse) · Alteration and improvements · Single Detached Dwelling · November 6, 2026 · Permit 26 133911 000 00-A
    $39,924

How to read this

Every figure here counts building permits on the City of Vaughan’s own record (Building Permits (City of Vaughan layer v_Permit_)), read November 29, 2026. A permit is permission to build, renovate or demolish under the Ontario Building Code; it is counted on the date it was issued, not when work started or finished. Construction value is the figure the permit states, the applicant's estimate of the cost of the work; it is not a sale price or an assessment. Homes created is the number of dwelling units the permit adds, as the record states it.

The kinds of work are VaughanIQ’s grouping of the municipality’s own permit types and work descriptions, so permits can be compared across months and areas; every permit listed also shows the municipality’s own words. Positions are the ones the record gives; ward and neighbourhood are the official outlines each position falls in.

The City's layer holds permits approved since January 2, 2020 and is edited daily; IQ keeps those approved since January 1, 2021. The issue date shown is the layer's Approval_Date.

Construction value is the City's Estimated_Construction_Value and units are its Dwelling_Units_Created, as published.

Kind of work is read from the City's permit type, type of work and type of building. The City files accessory residential buildings, designated structures and high-rise apartments under its own permit types; IQ groups them as accessory, other and new homes.

A single permit is not given a page of its own. The record names no owner, applicant, builder or contractor, and VaughanIQ keeps none: permits are listed by civic address, permit number and the work they allow.